Getting started

Add a schedule

Add Tm Gantt to a Qlik Cloud sheet, then bind the data that defines your schedule.

  1. Add one to eight dimensions. In Data mapping, choose a Row level dimension. Dimensions above it become collapsible groups; dimensions below it distinguish Activity instances on the same row.
  2. Add two to twelve measures. Assign Activity start and Activity end to the measures that hold those dates.
  3. Read Configuration checks in Data mapping. It lists missing dimensions, the Row level, or required measure roles.
  4. Add optional roles such as Display label or Progress, or show the Activity table.

Each Activity needs a valid start and end date to appear on the timeline.